Permit and Inspection Fee Schedule
Fees are assessed per Ordinance No. 10-2017 as set forth by Municipal Code Chapter 10. Article II. Sec. 10-33
PERMIT FEES:
Base Fee
: $0.01-$2,000.00
$25.00
Per Each $1,000.00 of cost:
$0.01 - $50,000.00
$9.00
$50,000.01 - $100,000.00
$5.00
$100,000.01 -
$3.00
**Permit fees are based on the project cost and are rounded up to the nearest $1,000.00.
Permitted Separately from Other Improvements:
Residential Roofing
$50
Electrical Upgrade to 200 amps
$40
Electrical Upgrade greater than 200 amps
$80
Water Heater and Water Softener
$25
HVAC
$40
Rooftop Heating/Cooling unit (per unit)
$40
Moving an existing Structure
$50
Placement of Dumpster in Right-of-Way:
1-15 days $15
16-30 days $25
Right of Way Permit:
Excavation with NO pavement cut:
per separate transverse cut
$50
per 100' length of parallel cut
$50
Excavation WITH pavement cut:
per separate transverse street cut
$100
per 100' length of parallel cut
$100
Pole Line Construction:
per linear foot of pole line
$0.25
Pipe/Conduit:
Base Fee
$50
per square yard of disturbance
$1.50
INSPECTION FEES:
Certificate of Occupancy:
Single Family Residence
$50
Two-Family Dwelling
$100
Multi-Family Dwelling
$100+$25/Unit
Class 1 Structure < 12,000 sq. ft.
$100
Class 1 Structure > 12,000 sq. ft.
$200
Gas Reconnect:
First and Second Inspection
$25
Additional inspections
$20
Electric Reconnect:
First inspection
$25
Additional inspections
$20
Missed Required Inspection Fee:
$50